您所在的位置: 华灵四方网 >  Analysis Report on China’s Power Industry in 2009

Analysis Report on China’s Power Industry in 2009

http://www.hlsf.com.cn        华灵四方网    




Analysis Report on China’s Power Industry in 2009  
著者 HL Consulting 出版时间 2010/4/9
页数 32 语言 English
表数目 19 图数目 0
订阅费用 USD: 1000 发送形式 Email PDF版

搜索更多报告 搜索词  
 

 

摘要

 

Under preparing...

 

报告目录

 

    Chapter 1 Development environment for power industry in Q4, 2009 1
    1.1 Effect of macro-economic tendency on power industry 1
    1.2 Effect of coal industry on power industry 2
    1.2.1 Coal supply was tight on the whole 3
    1.2.2 Coal price continued to rise 4
    1.2.3 Electrical coal was in short supply, and contractual coal price all increased 5
    1.3 Effect of industrial policy on power industry 6
    1.3.1 Industrial supervision progressed stably 6
    1.3.2 Reform made new progress in power market 8
   
    Chapter 2 Operation of power industry in Q4, 2009 14
    2.1 Overall operation 14
    2.2 Power production 15
    2.2.1 Overall production 15
    2.2.2 Structure of power production 16
    2.2.3 Capacity of power equipment 19
    2.2.4 Utilization of generating equipment 20
    2.3 Power transmission 20
    2.3.1 Power supply and sales of national power grid 20
    2.3.2 Cross-region power transmission 20
    2.3.3 Import and export of power 21
    2.4 Power consumption 21
    2.4.1 Social power consumption 21
    2.4.2 Industrial power consumption 22
    2.4.3 Regional power consumption 23
    2.5 Investment into fixed assets of power industry 23
    Chapter 3 Operation of power industry in Q4, 2009 25
    3.1 Overall operation 25
    3.2 Operation of power generation 26
    3.3 Operation of power supply industry 27
   
   
    Chapter 4 Hot spots in power industry in Q4, 2009 28
    4.1 Nuclear power equipment industry was open to private enterprises for the first time 28
    4.2 National Energy Administration: plans to shut down 10 million kw of small thermal power units in 2010 28
    4.3 China Huaneng Group will invest 7.7 billion Yuan to build a large coal-power integrated complex project in Zhundong in Xinjiang 29
    4.4 China’s first batch of 16 national energy research and development (experiment) centers were founded 29
   
   
    Chapter 5 Prediction on development of power industry in 2010 30
    5.1 Power supply and demand will be in balance and have some surplus 30
    5.2 Power structure adjustment will still be the direction for power industry to develop 30
    5.3 Increasing electrical coal price will affect profitability of power industry 31
   
    Table 1 Output of raw coal and growth, 2009 3
    Table 2 Policies concerning direct power purchase pattern for major power consumers issued since 2009 9
    Table 3 Enterprise cycle index of power and heat production and supply industry, 2004-Q4, 2009 15
    Table 4 National generation volume and growth by month, 2008-2009 15
    Table 5 Proportion of generation volume of various power sources in national power structure, 2009 16
    Table 6 Generation volume and growth of thermal power, 2009 16
    Table 7 Generation volume and growth of hydro power, 2009 17
    Table 8 Generation volume and growth of nuclear power, 2009 18
    Table 9 National new capacity of power generating and transmission equipment, 2009 19
    Table 10 Accumulative average utilization hour of national power generating equipment, 2009 20
    Table 11 Monthly social power consumption volume and growth, 2008-2009 22
    Table 12 National power consumption by industry, 2009 22
    Table 13 Accumulative investment into fixed assets of power industry, Dec, 2008-Dec, 2009 24
    Table 14 Structure of power infrastructure investment, 2009 24
    Table 15 Accumulative sales revenue of power industry, Nov, 2008-Nov, 2009 25
    Table 16 Operation of power production industry, Nov, 2008-Nov, 2009 26
    Table 17 Loss of power production industry, Nov, 2008-Nov, 2009 26
    Table 18 Operation of power supply industry, Nov, 2008-Nov, 2009 27
    Table 19 Loss of power supply industry, Nov, 2008-Nov, 2009 27
   
     


国内购买指南

(1)您可点击 ,输入您的联系方式,我们在1个工作日内和您联系,也可直接和我们电话联系,电话400-056-8868 。
(2)联系后我们销售人员将给客户发订单(或合同),订单上面有我们的付款帐号信息,您将定购款汇入我们订单指定的银行后,请及时将汇款回执和订单传真 到(010-67716520),我们根据订单信息发送报告。
(3)对于非工作时间,您可通过我们的24小时电话400-056-8868 和我们联系,使用这个电话时,请尽量多等待一些时间,我们的电话系统会顺序呼叫值班人员。您也可以点击,输入您的联系方式,然后系统会引导您进入国内银行网上支付系统--快钱的页面,您付款后一般会白天4个小时内,晚上8小时内,客户服务人员会和您联系。

 


国外购买指南

国外付款支持Visa和Mastercard信用卡付款和银行柜台转帐

(1)银行柜台转帐方式

建议采用银行柜台转帐方式,国外银行 柜台转帐路径点此

(2)Visa和Mastercard信用卡付款

您也可通过Paypal系统用国外信用卡支付,请点击下列按钮通过Paypal网关进行支付(本公司英文名称为Beijing HL Consulting Co., Ltd),Paypal是国际上较为流行的电子支付工具,客户在用paypal支付前,需要在www.paypal.com网站注册一个帐号,并在帐号中关联其信用卡,然后就可向本公司支付。

 

 





 

微信
微博
微信 微博

联系方式

  • 联系电话

    . 400-056-8868 ,13911268021沈先生
    (24小时热线)
    . 010-67716526
    . 010-67716522


  • 新三板


  • 加盟
  • 华灵四方欢迎有志于上市咨询、工程咨询、市场调查、管理咨询的各界人士加盟合作,可以采用灵活的分公司、办事处、加盟商等合作模式,共同做大做强咨询业。有意联系 沈先生 13911268021 01051663150